Factory & quality

A real production environment buyers can evaluate.

The factory section shows the actual operating spaces supplied for the project: forming, pressing, heat treatment, assembly, packaging-material storage, finished-goods warehousing and office coordination.

Main production hallPressing lineFinished goods warehouse
3,000 m²Factory area supplied by management
10 linesProduction lines supplied by management
50–100 peopleWorkforce range supplied by management
100,000 pcs/monthSupplied monthly capacity
Production gallery

From metal forming to final packing.

Forming & machining

Forming & machining

Cookware body shaping and machining operations.

Heat treatment

Heat treatment

Controlled process equipment for cookware preparation.

Semi-finished inventory

Semi-finished inventory

Work-in-process cookware organized between stages.

Assembly line

Assembly line

Handles, lids and components assembled and checked.

Packaging materials

Packaging materials

Carton and packing materials prepared for orders.

Warehouse management

Warehouse management

Finished and packed goods organized for dispatch.

Quality assurance framework

Control points at every commercially important stage.

01

Incoming material

Material identity, appearance and buyer-defined documentation.

02

In-process inspection

Dimensions, forming, surface, handle and component alignment.

03

Performance checks

Coating, lid fit, handle assembly and product-use checks by model.

04

Final & packaging

Appearance, quantity, label, carton and shipment readiness.

Factory video library

See the operation, not only the catalogue.

Production tour

Workshop equipment, processing and operating environment.

Workshop overview

Factory areas, inventory and manufacturing activity.

Product demonstration

Cookware presentation and product-use demonstration.

Buyer verification

Selected third-party report previews are available.

The project includes management-supplied report pages from CTT, SGS and Bureau Veritas. Their exact product scope, date, validity and full report availability should be confirmed during quotation.

  • CTT report reference: CTT1910014623CN.
  • SGS report reference: NGBHL23001027101.
  • Bureau Veritas report reference: BV25268SC405.
  • Full documents are shared privately with qualified buyers when approved.
View report previews